Who pulls the permits, and are they in the price?
Permit fees are in the price we quote you. They’re not a line that shows up later, after you have already picked a contractor and told everyone the kitchen is happening.
Why is it in the number?
Because a permit isn’t a surprise. On the work that needs one, it’s a known cost. It belongs in the number.
A price with the permit fees in it and a price with them left out aren’t the same price. The second one looks lower right up until it’s not.
The work that usually brings a permit into it
Your city sets the rules, not us, and they’re not the same on both sides of the state line. As a rough guide, a permit tends to come in when the job touches one of these.
- Moving plumbing, gas or wiring rather than reconnecting what’s there.
- Taking out a wall, or changing one that’s holding something up.
- Cutting a window or a door opening where there wasn’t one.
- Finishing a basement, where the work usually touches all of the above.
A refresh that keeps the layout and swaps what you see and touch often needs nothing. That’s one of the reasons it costs less.
We pull them
You don’t file anything. We pull the permits for the work we’re doing, and the fees are already in the number on your quote.
That’s the part worth asking every contractor you talk to, because the two questions come apart. Somebody can pull the permit for you and still hand you the fee afterwards as an extra.
Do inspections hold up the job?
They can. Where the work needs an inspection, it has to pass before the next stage goes in, and that runs on the city’s calendar rather than ours. It’s one of the four things that sets how long a job takes.
How long will you be in my house? goes through the other three.
The other questions people ask
Want a number with the permits in it?
Tell us what you want done. We’ll call you back within one business day and set a time to come look.