How long will you be in my house?
A kitchen, bath, or basement runs 2 to 8 weeks, depending on how big the project is. New countertops and paint sit at one end of it. Everything down to the studs, with the sink moved, sits at the other.
What sets the schedule?
Four things decide where your job lands in that span.
- How much is coming out
- Countertops and a backsplash is a shorter job than everything down to the studs. The two kinds of kitchen job are the clearest way to see the difference.
- What has to be ordered
- Cabinets and countertops arrive on the supplier’s schedule, not ours. Stone countertops are measured after the cabinets are set, then cut. That gap is normal and it’s in every job.
- What moves behind the walls
- Plumbing, wiring and framing bring in trades, and trades have to follow each other in order. One day of plumbing can hold up three days of everything else.
- Inspections
- Where the work needs them, they run on the city’s calendar. One has to pass before the next stage goes in. See permits.
And one thing nobody can put on a calendar in advance: what turns up once a wall is open.
How long does a basement or a whole house take?
The 2 to 8 weeks above is for kitchens and baths. A basement waits on inspections at more stages, and a whole house is several jobs in a row rather than one job. You get the calendar for your rooms with the quote.
Do I have to move out?
For a kitchen or a bath, most people stay in the house.
Whether that’s comfortable in yours is a different question, and it turns on a short list of things.
- Whether the bathroom coming out is the only bathroom.
- Whether water, power or heat has to be off for part of the work.
- Whether anyone in the house works nights or sleeps days.
- Whether there’s a date you have to be back to normal by.
Say you’re living there when you ask for the price. The person who walks the job will tell you what it looks like in your house, and on a whole-home job it changes the order the work goes in.
Who gives you the dates?
The person who walks your kitchen is the person who writes your quote. Ask them for the calendar while they’re standing in the room, because that’s the only place the answer is any good.
The quote lists the work line by line, with what’s included on each one.
What to ask when we come look
- Which days the room is out of service.
- What’s being waited on, and when it gets ordered.
- What happens to the schedule if an inspection doesn’t pass first time.
- Who to call on a day when nobody turns up.
The other questions people ask