Basement finishing
A basement is usually the least expensive room you can add to a house, because the walls, the floor and the roof over it are already there. What it needs is everything else. Here’s what that is, and what to check before any of it starts.
Check three things first
Each one decides what the room can be. All three are easier to deal with before the walls go up than after.
Water
A basement that takes on water has to be dry before it gets finished. Stains on the floor, white powder on the walls and a sump pump that runs a lot are the signs. Fix the water first. Drywall doesn’t forgive it.
Height
Measure from the floor to the lowest thing overhead. A beam, a duct, a drain line. That’s your real ceiling, and it decides which kind of ceiling the room can have.
A way out
Code calls for a second way out of a basement bedroom, which usually means a window big enough to climb through. If there’s not one, cutting it in is its own line on the quote.
What goes in
The concrete stays. So do the stairs, the furnace and the water heater. Everything else is built in front of them.
- New walls, framed and insulated, in front of the concrete
- A bathroom, set where the drain line already is if there’s one
- A window big enough to climb out of, for the bedroom
- The furnace and the water heater stay, in a room of their own
What’s on a basement quote?
One line for each part of the job, and a price on each line.
- Framing and insulation
- Electrical
- Plumbing, if there’s a bath or a bar
- Heating and cooling runs
- Drywall
- The ceiling
- Flooring
- Trim, doors and paint
- The window, if one has to be cut in
- The punch list at the end
Where you haven’t picked a material yet, the line says how much is set aside for it. A flooring line might say plank flooring, with up to a set number of dollars a square foot.
What moves the price?
- A bathroom
- It’s the most expensive room down there. If the builder left drain stubs in the floor, it costs a good deal less than breaking concrete to add them.
- The window
- Cutting a new opening in a foundation wall and digging the well outside is a job by itself.
- The ceiling
- Drywall looks like the rest of the house. A drop ceiling keeps the pipes and wires easy to reach. Painting what’s there costs the least.
- How many rooms
- Every wall is framing, wiring, drywall and a door. One open room costs less than three small ones.
- The floor
- Concrete is cold and it’s rarely flat. What goes over it depends on both.
What is not in the number?
- Anything you haven’t picked yet. That line carries an allowance, which is money set aside, not the final cost of the flooring you choose later.
- Anything found once the walls are framed. It’s written up on its own line, with its own price, before the work goes on.
What sets the schedule?
Three things. Whether there’s a bathroom. Whether a window has to be cut in. And the inspections along the way, which run on the city’s calendar.
Framing and drywall move quickly. The waiting is in between. Ask for the calendar when you get the price.
Before we come out
It helps to know:
- What the room is for. A place for the kids, a guest room and a bath, an office.
- Whether it has ever had water, and when.
- What has to stay easy to reach. The furnace, the electrical panel, the sump pump.
- A budget range, if you have one. It tells us how many rooms to price.