Unique Remodeling KC Call 816-214-3044 Get a price

What happens to the dust and my stuff?

Demolition makes dust, and for a while the room is a work site and not a room. Nobody can make that part pretty. The crews cover things up and clean up, usually at the end of each day, and they try to leave you a house you can still live in.

Why usually and not every night?

Because some days it’s the wrong call. Open something up late in the afternoon and the sensible thing is to seal the room and finish in the morning.

So: a house you can still live in. Not a show home every night.

What’s already on the quote?

Two of the lines on a kitchen or bath quote are about things leaving your house rather than things arriving in it.

  • Demo and haul-off. The old cabinets, countertops, backsplash and flooring come out and go, and the tub, vanity and tile in a bath. Getting rid of it is part of the job, not something that waits in your driveway for a trailer.
  • The punch list at the end. The small fixes that only turn up once everything is in and the room is clean enough to look at properly.

What to settle before the first day

Ask these while somebody is standing in your hallway. The answer is different in a ranch with one hall than in a two-story with a back door.

  • Which door the crew uses, and which rooms they walk through to get there.
  • Where the barrier goes, and what gets covered on the way.
  • Where debris sits before it leaves.
  • Whether the furnace runs while demo is going on, and what happens to the vents in that room.
  • Who moves what, and by when.

Ask for the answers on the quote, next to the rest of the work. Anything in writing is a thing you can hold us to. Something somebody said in a driveway isn’t.

What’s worth doing yourself?

  • Empty the cabinets and drawers. What’s in them is the one part nobody else can sort for you.
  • Take what you care about off the walls in the next room over. Demolition carries further through a house than people expect.
  • If the kitchen is going, pick a spot for the coffee maker and the microwave before you need one.
  • Put the cat somewhere with a door that shuts. Work days mean doors propped open.

How long will you be living around it?

A kitchen, bath, or basement runs 2 to 8 weeks, depending on how big the project is, and for a kitchen or a bath most people stay in the house. What sets the calendar is worth a read before you plan around it.

Want to know how it would run in your house?

Tell us what you want done. We’ll call you back within one business day and set a time to come look.

Get a price