Unique Remodeling KC Call 816-214-3044 Get a price

What is this going to cost?

A kitchen runs $7,670 to $22,440. A bath runs $4,340 to $15,550. A basement runs $18,990 to $60,370. Where yours lands depends on how big the job is, and the rest of this page is how that gets decided.

Get a price for your project

How does the number get built?

Every part of the job gets its own line: demo, plumbing, electrical, tile, cabinets, countertops, the punch list at the end. What’s included sits on the line with the price, so you can see what you’re buying.

Permit fees are in there, not added on afterwards.

Quote

Kitchen and bath remodel

  • DemoOld cabinets, countertops, backsplash and flooring out and hauled off. Tub, vanity and tile in the bath.
  • PlumbingShower supply and drain moved. Sink, disposal and appliances hooked back up.
  • ElectricalNew switches and outlets. Lights moved to fit the new layout.
  • TileBath floor, shower walls and pan, and the waterproofing behind them.
  • CabinetsNew cabinets, soft-close doors and drawers, hardware and trim.
  • CountertopsQuartz. A set allowance per square foot for the slab you pick.
  • Punch listThe small fixes at the end.

Total

Lines from our kitchen and bath quotes. Yours will list your rooms, with a price on every line.

What moves the number most?

Whether anything moves. Leave the sink, the stove and the fridge where they’re and you have one job. Move the sink twelve feet and you have another one, even though both end up with new cabinets and new counters.

Moving the sink brings in a plumber, an inspector in some cities, and a day or two of waiting on both. Moving a wall adds a framer, and an engineer if the wall was holding something up. Two kitchens the same size can be thousands apart on that alone. It’s the first thing we look at when we walk the room.

After that, in order:

  • Cabinets and tile. Usually the two biggest lines in a kitchen or a bath. New cabinets built for the room cost a good deal more than painting the ones you have.
  • How far the floor runs. Kitchen flooring rarely stops at the kitchen doorway, and nobody wants a seam in the middle of a hallway.
  • How old the house is. A 1950s ranch and a house built in the last twenty years hide different things in the walls.
  • What you pick. Two quartz slabs can be double each other for the same square footage.

What if something turns up behind a wall?

Nobody knows what’s in a wall until it’s open. We can’t price what we can’t see yet, so that work isn’t guessed at in the quote.

When something turns up, we stop and call you before we go any further. You get it written up on its own line with its own price, and nothing happens until you say yes to it.

It runs the other way too. If a job opens up smaller than it looked, you pay for the smaller job.

What usually turns up, and what it means.

What is an allowance?

Money set aside on a line for something you haven’t picked yet. Tile, countertops, fixtures, lighting.

It’s a real number we expect the thing to cost, not a placeholder. Pick something under it and the difference comes back off your price. Pick the slab you fell in love with at the yard and the difference goes on.

How allowances are set and settled.

How do I get a number for my house?

Tell us what you want done and we’ll call you back to set a time. Then we come look and measure. The person who walks the room with you is the one who writes your quote. Nothing gets priced off a photograph alone.

Send photos with your request and we can get a head start before anyone drives out.

Questions people ask about price

Does the estimate cost anything?

No. We come look, measure and write the quote at no charge, and you keep it whether you hire us or not.

When do I pay?

Half at signing, and the rest follows the work. The dates are on the quote before you sign anything.

Do you offer financing?

Yes, through Wisetack. Ask about it when we come look and we’ll go through what’s available for your job.

How soon will I hear back?

We call you back within one business day of your request, and we set the time to come look on that call.

What does a kitchen remodel cost?

$7,670 to $22,440, depending on how big the job is. That is a wide span because a kitchen isn’t one job. New countertops and paint is a kitchen remodel. So is a wall out and the sink moved twelve feet. Which end you land on comes down to how much moves, and the only way to know is somebody standing in your kitchen.

What does a bathroom remodel cost?

$4,340 to $15,550, depending on how big the job is. A vanity, a floor and a fresh tub surround sits near the bottom. Moving the shower, redoing the waterproofing and tiling floor to ceiling sits near the top.

What does a basement cost to finish?

$18,990 to $60,370, depending on how big the job is. It is the widest span of the three because a basement is really several jobs at once. Framing, electrical, plumbing if a bathroom is going in, and every surface built up from bare concrete.

Can the price change after you start?

Only two ways. Something turns up behind a wall, or you change your mind about something. Both get written up on their own line with their own price, and both need your yes before the work goes on.

How long will the work take?

A kitchen, bath, or basement runs 2 to 8 weeks, depending on how big the project is. What sets the schedule, and what moves it once it’s set.

Are permit fees extra?

No. Where the job needs a permit, we pull it and the fee is a line on the quote. More on permits.

Will you price against another bid?

We’ll walk through it with you line by line, which is usually more useful. Two quotes that look far apart are often two different jobs. The gap is sitting in what one of them left out.

Ready for a number?

Tell us what you want done. We’ll call you back within one business day and set a time to come look.

Get a price