Unique Remodeling KC
Kitchen remodeling
There are two kinds of kitchen job. One keeps the room you have and replaces what you see and touch. The other moves things. They’re priced very differently, so it helps to know which one you’re asking for.
Kitchens we remodeled








A refresh keeps the layout
The sink, the range and the walls stay where they’re. What changes is what you see.
- New countertops
- New sink and faucet
- New backsplash
- The cabinets you have, repainted, with new hardware
A refresh often takes in lighting and flooring too. What it doesn’t do is move the sink, take out a wall or change where the cabinets sit. Once the sink moves, it’s a remodel.
A full remodel can change the room
Everything comes out. Then the room goes back together the way you want it laid out.
- A wall comes out
- An island goes in
- The sink moves to the island
- New cabinets on both walls
Behind the picture is the work you don’t see when it’s done. Plumbing, wiring and lighting moved to fit the new layout. Openings reframed. Drywall, flooring, trim and paint.
What’s on a kitchen quote?
One line for each part of the job, and a price on each line.
- Demo and haul-off
- Framing, where an opening moves
- Plumbing and electrical
- Drywall
- Cabinets
- Countertops
- Backsplash and flooring
- Fixtures and hardware
- Trim, doors and paint
- The punch list at the end
Where you haven’t picked a material yet, the line says how much is set aside for it. A countertop line might say quartz, with up to a set number of dollars a square foot for the slab.
What moves the price?
- Whether anything moves
- A sink that stays put is the cheapest sink there is. Moving plumbing, gas or wiring adds trades and days.
- Cabinets
- Usually the biggest line on a kitchen quote. New cabinets built for the room cost a good deal more than repainting the ones you have.
- Countertops
- Priced by the square foot. The slab you pick sets the rate.
- How far the floor runs
- Kitchen flooring rarely stops at the kitchen doorway.
- What’s behind the walls
- Nobody knows until they’re open. If something turns up, it gets written up as its own line.
What is not in the number?
- Anything you haven’t picked yet. That line carries an allowance, which is money set aside, not the final cost of the tile you choose later.
- Anything found once a wall is open. It’s written up on its own line, with its own price, before the work goes on.
What sets the schedule?
Three things. How much is being torn out. How long the cabinets and countertops take to arrive. And how much has to move behind the walls.
Stone countertops are measured after the cabinets are set, then cut. That gap is normal. Ask for the calendar when you get the price.
Before we come out
It helps to know:
- What bothers you most about the kitchen you have.
- Whether the sink and range can stay where they’re.
- Which kitchens you like. Screenshots are fine.
- A budget range, if you have one. It tells us which cabinets and countertops to price.
A few more of them

A kitchen we remodeled 
A kitchen we remodeled 
A kitchen we remodeled 
A kitchen we remodeled 
A kitchen we remodeled
Want a number for your kitchen?
Tell us what you want done. We’ll call you back within one business day and set a time to come look.